After the completion of housing decoration, acceptance is essential. The owner's acceptance of the project is based on the decoration contract, the construction drawings signed by the owner and the relevant documents of the quality inspection of the decoration project by the relevant national departments. Specifically, the acceptance is mainly from the following aspects: Furniture: smooth lines, sealing lines, corner lines and panel interfaces are dense and smooth, door cabinet drawers are pushed and pulled smoothly, and handles are symmetrical and beautiful. Power line: the circuit laying should comply with the construction regulations and safety standards

after the completion of housing decoration, acceptance is essential. The standard for the owner to accept the project is the decoration contract, the construction drawings signed by the owner and the relevant documents of the relevant national departments on the quality inspection of the decoration project. The specific acceptance is mainly from the following aspects:

furniture: smooth lines, sealing lines, corner lines and panel joints are dense and smooth, the door cabinet drawers are pushed and pulled smoothly, and the handles are symmetrical and beautiful

power lines: the circuit laying should comply with the construction regulations and safety standards, the socket should be no less than 30cm from the ground, the three wire socket ground wire, the kitchen and air conditioning lines should be laid in a special line, the main gate should be installed with an anti leakage switch, and the lamps should be installed firmly

doors and windows: open and close freely, and the door frame, window frame and glass perimeter are well sealed

ground: the floor tiles are flat, the texture is clear, the color is uniform, the cross hairs are horizontal and vertical, the floor is paved stably, the joints are even and straight, the paint color is consistent, and there are no scratches

wall: the wallpaper is pasted firmly, the joints are tight, the patterns are complete, the patterns are consistent, the edge seams are neat without burrs, the paint is uniform, flat, concave convex, no color difference, and no ash falling

water supply and drainage facilities: the water supply pipe has no leakage, and the opening and closing valves operate well; The drainage is smooth without leakage and ponding

paint: the paint surface is smooth, feels good, has enough oil, and is free of nail holes, scanning marks, burrs and color differences

in short, the acceptance of new houses should be careful. It is best to turn on all light sources first to avoid unnecessary trouble in the future